
Key takeaways
- Tie every application to a parcel, and link related files on the same property.
- Track circulation: who has responded, who has not, and remind the ones who have not.
- Start with one or two application types, then add the rest in phases.
Planning applications are the hardest permits to move online. One file can involve an applicant, an agent, three departments, outside agencies, a public notice, a hearing and a list of conditions that takes months to clear.
In Canada this covers consents and severances, minor variances, site plan control, zoning amendments, subdivisions and official plan amendments. In the United States the same work goes by variances, special-use permits, site plan review, rezonings and plats. The process problems are the same in both.
Start from the property, not the form
A planning file belongs to a piece of land. Check the address against your own GIS data when the application comes in, tie the file to its parcel, and link it to other files on the same property. A planner opening a minor variance should see last year's consent on that lot without searching for it.
This is how planning and zoning applications are set up in Milo: property-based and file-based, with related files linked.
Circulation without the email chase
Most delay in a planning file is waiting for comments. When circulation runs by email, nobody can say on a given day who has answered. Give each outside reviewer an account limited to the files sent to them. That includes the conservation authority, the utilities, the county and the ministry.
The circulation stage then shows who has responded and who has not, and sends the reminders for you. Comments stay on the file, with a name and a date on each one.
Treat conditions of approval as a stage
An approval with conditions is not finished. Each condition needs an owner who clears it: the applicant, a municipal role or an outside agency. Model the conditions as a stage in the workflow, so the file cannot close until every one is cleared and anyone can see what is still outstanding.
Notices and letters from the file
Planning produces a lot of paper: notices of application, notices of hearing, comment letters, notices of decision. Each should come from the file, not from a separate document:
- Automated notices when a file reaches a set point.
- Your own templates, with sections staff can edit.
- Comments compiled into one letter for review before it is sent.
Output as PDF, Word or Google Docs covers what most committees and councils ask for.
Measure processing time fairly
Council will ask how long applications take. A single number hides the answer. Split the time three ways: with staff, with the applicant and with outside agencies. A file that sat for six weeks waiting for a revised drawing is not a staff delay.
Capture dwelling units, floor area and lot counts at each approval stage too, so housing figures come from the files and do not have to be rebuilt in a spreadsheet.
Roll out in phases
Do not launch every application type at once. Milo's standard delivery plan is phased:
- Phase 1. Consents and minor variances, live in six to eight weeks.
- Phase 2. Site plan control and zoning amendments, two to three weeks each.
- Phase 3. Subdivisions and official plan amendments. All six types in about five months.
The planning system can run alongside your building-permit system. Planning files and building permits have different rhythms, and they do not need to be replaced together.


